startup2startup asked Amy Jo Kim, co-founder/CEO at shufflebrain, to speak at the first event of 200...
EU HR Javier Solana gave an interview with France 24 News station about about Iran and the EU's inte...
EU HR Javier Solana gave an interview with France 24 News station about about Iran and the EU's inte...
Documentally talks to the ou's Dr Isobel Falconer about what's she's learning at the AL conference. ...
A video interview with David Lidz, canidate for Hagerstown City Council, discussing the state of the...
NASA |
(13.33%) (3 Votes)
|
Views: (1519) Date: (Dec. 17, 1998) Pages: () |
Abstract: Nancy Currie discusses the seven-day mission that will be highlighted by the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which will already be in orbit, and two spacewalks to connect power and data transmission cables between the Node and the FGB. Node 1 will be the first Space Station hardware delivered by the Space Shuttle. He also disscusses the assembly sequence. The crew will conduct a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. Once the two elements are docked, Ross and Newman will conduct two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. The day following the spacewalks, Endeavour will undock from the two components, completing the first Space Station assembly mission.